Key takeaway
kW tells you how much power can be supplied. kWh tells you how much energy is available. Neither figure alone specifies the backup performance.
Separate power from energy
Power capacity describes a continuous output rate, typically in kW or MW. Energy capacity is measured in kWh or MWh. [1] For a constant load, required delivered energy is power multiplied by time.
Formula: Delivered energy (kWh) = load (kW) × backup duration (hours)
A 100 kW load for two hours therefore requires 200 kWh delivered to the load. A varying load needs its energy added across the operating intervals rather than assuming the peak load runs continuously.
An illustrative sizing calculation
Suppose the target is 200 kWh of delivered backup energy. Assume a 90% allowable discharge window, 95% discharge-path efficiency and an 80% end-of-life capacity factor. These are deliberately disclosed example inputs, not product ratings.
Formula: Nominal energy = 200 ÷ (0.90 × 0.95 × 0.80) = approximately 292.4 kWh
This calculation adds reserve for the selected assumptions. It does not by itself validate the chemistry, output power, cooling, protection or installation. Do not apply those allowances again if a supplier already quotes guaranteed usable AC energy under the same end-of-life conditions.
Why duration changes the proposed system
| Steady load | Required duration | Delivered energy |
|---|---|---|
| 100 kW | 1 hour | 100 kWh |
| 100 kW | 2 hours | 200 kWh |
| 100 kW | 3 hours | 300 kWh |
| 100 kW | 6 hours | 600 kWh |
These are load-side energy requirements. They are not nominal battery sizes or commercial product options. The table is useful for framing a requirement, not selecting equipment without a design study.
Check the charging window as well
For a further simplified example, delivering 200 kWh at 90% AC round-trip efficiency requires about 222.2 kWh to charge. If the available charging power were a constant 100 kW, this would require at least 2.22 equivalent full-power hours before additional constraints or auxiliary consumption outside that efficiency boundary.
Available site capacity, varying generation and actual charging limits may change the window. Our recommendation is to review consecutive operating days and repeat outages, not just a single fully charged discharge. Integrated planning considers both technology size and dispatch. [2]
What to include in a sizing request
We recommend supplying interval load data, the essential-load list, required duration, motor-starting details, charging sources, tariff information, site conditions and the required availability at end of life. Clarify whether the objective is backup, daily energy shifting or a combination with an agreed priority.
Ask for the output-power basis, usable-energy basis, discharge limits, temperature assumptions, remaining capacity guarantee and acceptance test. Treat any simple web estimate as an initial screening result.
The DG vs BESS cost guide explains how these sizing choices feed into capital cost and payback. A larger duration is not automatically a better financial result.